Su Casa Royal

BY

On Southern Bypass, Narendrapur - Big Bazar 1 km, School 1.5 km. Metro 5 km, Hiland Park 5.5 km, Hospital 6 km

35.71 Lacs onwards

Available BHKs

2, 3

No of units

86

No of blocks

2

STATUS

Under Construction

POSSESSION DATE

31 Dec, 2023

HIRA ID(s)

HIRA/P/SOU/2019/000375

One of kind project of southern bypass near Khudiram Metro. It's a B+G+9 storey building of two towers adjoined with a state-of-the-art Sky walk. The project is spread over 0.8 acres consists of 2 & 3 BHK luxury apartments. This luxury residence is a perfect combination of elegance and affordability

Layout

  • Flat A
  • Flat C
  • Flat H
  • Flat I
  • Flat J

Localities

Necessities nearby
  • Bank/ATMs
  • Hospitals
  • Schools
  • Parks
Essentials nearby
  • Groceries
  • Pharmacies
  • Shopping malls
Entertainment
  • Restaurants
  • Movie Theatres
  • Bars
Commute
  • Bus Stops
  • Railway Stations
  • Airports
The Property

Amenities

Swimming Pool

Indoor Games Room

Community Hall

AC Gymnasium

Water Treatment Plant

Generator

Chlidren Play Area

Yoga And Meditation Area

CCTV

Lift

Specs

Floorings

  • Toilets :

    Antiskid tiles

  • All Rooms :

    Vitrified tiles

Fittings

  • Electrical :

    Concealed ISI copper wiring with Modular switches

  • AC Points :

    In Master Bedroom

  • T.V./Telephone points :

    Living / Dining hall

  • Windows :

    luminum sliding windows with clear glass panes along with integrated grill

  • Kitchen :

    Cooking platform of Green Marble with Stainless Steel sink

Walls

  • Kitchen :

    Glazed tiles up to 3’6” ft above the cooking platform

  • Toilets :

    Glazed tiles up to height of 6’

Su Casa Royal

Download Brochure

Want to know more? Download or Brochure

Payment Plan

Application Money1 Lacs of total consideration + GST
On agreement within 20 days of application (adjust application money)10% of total consideration + GST
On completion of piling10% of total consideration + GST
On completion of Basement10% of total consideration + GST
1st Floor casting completion10% of total consideration + GST
3rd Floor casting completion10% of total consideration + GST
5th Floor casting completion10% of total consideration + GST
7th Floor casting completion10% of total consideration + GST
9th Floor casting completion10% of total consideration + GST
Respective flat Brick work completion10% of total consideration + GST
On offer of possetion10% of total consideration + GST

Interest on delayed payment @ SBI PLR + 2% p.a.
18 Month lock-in period
Applicable GST & other levies with each instalment extra
Any additional taxes, both present & future, such as GST etc will be payable as extra as applicable

Construction Updates

Taken On : 2020-10-20

Taken On : 2020-10-20

Taken On : 2020-10-20

Related Properties