fbpx
Go To

Developer: Rupayan Group

23 Lac - 25 Lac
Location Rajpur

Overview

Land Area: 50 Cottahs (Approx)
No. of Blocks: 2
No. of Floor: G+5

Location Map

 

Features

  • AC Community hall
    AC Mall Gymnasium
    Decorated Common Roof
    Indoor Games
  • Kid's Cornor
    Landscaped Garden
    Swimming Pool

Specifications

  • Structure
    RCC with bricks
  • Walls
    Internal: Plaster of Paris Finish
  • External: Finishing with weather coat paint with water proofing compound
  • Flooring
    Entire flat with Vitrified tiles
  • Toilets with Antiskid tiles
  • Electrical
    Concealed ISI copper wiring with Modular switches Adequate light and power points
  • T.V / Telephone points in living/dining hall
  • One AC point in master bedroom
  • Kitchen
    Cooking platform of Green Marble with Stainless steel sink
  • Glazed tiles up to 3’6”ft above the cooking platform
  • Roof
    Common roof with water proofing compound treatment
  • Toilets
    Concealed pipeline with Geyser point at one toilets
  • Glazed tiles up to a height of 6’
  • CP bath fittings of Jaquar or equivalent
  • Sanitary fittings of Hindware/Parryware
  • Doors
    Main door flush with teak wood finish
  • Other doors flush with enamel paints
  • Windows
    Aluminum sliding windows with clear glass panes along with integrated grill
  • Water supply
    Deep tube well water supply
  • Overhead tank for sufficient storage and supply
  • Lift
    5 Passenger lift of Adams equivalent
  • Generator
    24 Hrs power back up

Site Layout

 

Floor Plans

Floor Plan Block A

Floor Plan Block B

Price list & Payment schedule

The amount to be paid by the Purchaser in installment as per the progress of the construction of the said building in the manner as follows:-
1.   1,00,000/- on Application
2.  20% within 15 days on or before the execution of this agreement (including booking amount)
3.  10% within 7 days after casting of the ground floor
4.  10% within 7 days after casting of the first floor
5.  10% within 7 days after casting of the second floor
6.  10% within 7 days after casting of the third floor
7.  10% within 7 days after casting of the fourth floor
8.  10% within 7 days after casting of the fifth floor
9.  5% within 7 days after completion of brick works
10. 5% within 7 days after completion of outside and inside Plaster works
11.  5% within 7 days after completion of flooring
12.  5% before the delivery of possession of the flat

Construction Gallery

Contact Information

40, Ashutosh Mukherjee Road, 2nd Floor, Kolkata - 700020

Location

Share This Property

Share