fbpx
Go To

Developer: Rupayan Group

23 Lac - 29 Lac
Location Narendrapur, Southern Bypass

Overview

Land Area: 40 Cottahs
No. Of Blocks: 4
No. Of Floor: G+4

Location Map

 

Features

  • AC Community Hall cum Indoor Games
    AC Gymnasium
    Decorated Roof
    DTH Facility
  • Green Landscaping
    Water Treatment Plant

Specifications

  • STRUCTURE
    RCC with bricks
  • WALLS
    Internal - Plaster of Paris finish
  • External - Finishing with Weather coat paint with water proofing compound
  • FLOORING
    Entire flat with Vitrified tiles
  • Toilets with Anti skid tiles
  • ELECTRICALS
    Concealed ISI copper wiring with Modular switches
  • Adequate light and power points
  • T.V/ Telephone points in living/dining hall
  • One AC point in master bed room.
  • KITCHEN
    Cooking Platform Green Marble
  • Stainless steel sink
  • Glazed tiles up to 3’6” ft above the cooking platform
  • TOILETS
    Concealed pipeline with hot and cold water lines with Geyser point at one toilets
  • Glazed tiles up to a height of 6’
  • CP bath fittings of Jaquar equivalent, sanitary fittings of Hindware / Parryware
  • DOORS
    Main door flush with teak wood finish
  • Other doors flush with enamel paints WINDOWS:
  • Aluminum sliding windows with glass panes along with intedrated grill
  • WATER SUPPLY
    Deep tube well water supply
  • Overhead tank for sufficient storage and supply
  • LIFT
    5 Passenger lift of reputed make
  • GENERATOR
    24 Hrs power back up
  • ROOF
    Common roof with special treatment

Site Layout

 

Floor Plans

Floor Plan Block 1

Floor Plan Block 2

Floor Plan Block 3

Floor Plan Block 4

Price list & Payment schedule

  1. 1,00,000/- on Application.
  2. 20% within 15 days on or before the execution of this agreement (including application amount)
  3. 10% within 7 days after casting of the ground floor
  4. 10% within 7 days after casting of the first floor
  5. 10% within 7 days after casting of the second floor
  6. 10% within 7 days after casting of the third floor
  7. 10% within 7 days after casting of the fourth floor
  8. 10% within 7 days after completion of brick works
  9. 10% within 7 days after completion of flooring
  10. 10% before the delivery of possession of the flat

Construction Gallery

Contact Information

40, Ashutosh Mukherjee Road, 2nd Floor, Kolkata - 700020

Location

Share This Property

Share